Assets & devices · registration and lifecycleindustryops.app
Assets register

Registered, tested,retired — on therecord.

A live record of the electrical equipment at every site you service, held against the address rather than the client — so the history survives a change of owner, agent or tenant. From the day an installer registers a switchboard to the day it's decommissioned and recycled.

The problem

Equipment outlasts the contract.

Compliance obligations attach to equipment, but most systems file that equipment under whoever is paying the invoice. When the managing agent changes or a building is sold, the test history goes with the old client record and the next technician starts from nothing.

We attach each asset to a location. Clients, jobs and invoices reference the location; the equipment record stays put.

Where the record lives
Most systems
Client
Job
Asset
Test history

Client leaves — history leaves.

IndustryOps
Location
Asset
Test history
Defects

Ten years of service reads as ten years on the first visit.

What it covers

Nine asset types, each with its own standard.

Each type carries its own fields, the standard that applies to it, and a default test interval — so due dates are calculated rather than remembered.

A S 0 1
Switchboards
Board schedule, spare ways, main switch rating
A S 0 2
Circuits & breakers
Pole count, rating, curve, protected area
A S 0 3
RCDs
Trip time, trip current, push-button and instrument tests
A S 0 4
Smoke alarms
Type, interconnection, battery and expiry dates
A S 0 5
Emergency & exit lighting
Discharge test duration, luminaire schedule
A S 0 6
Solar & inverters
Array layout, string data, inverter make and firmware
A S 0 7
Hot water systems
Element, thermostat, tempering valve service
A S 0 8
Air conditioning
Unit type, refrigerant, service interval
A S 0 9
EV chargers
Mode, output, load management, firmware
Lifecycle

From the day it goes in to the day it's recycled.

The register isn't a static list. Supplier catalogues feed the registration, connected equipment feeds itself, and a recall notice reaches straight into the assets it affects — wherever they're installed.

Asset lifecycle · inbound feeds and interventionsLive
INBOUNDLIFECYCLEINTERVENTIONCATALOGUENOTICETELEMETRYFLAGGEDREPLACERECTIFIEDIN 01Supplier feedMake, model, batch,ratings, standardIN 02Recall noticesManufacturer andregulator bulletinsIN 03Device dataBatteries, inverters,EV chargers, BMSRECALL MATCHEDEvery affected asset, every siteMatched on make, model and batch — flaggedin place, scheduled for replacement01RegisterInstalled andrecorded to a location02TagQR ID issuedand fixed to the plant03In serviceLive on the register,scheduled by standard04Test & defectLogged, passed,failed or rectified05DecommissionOut of service witha date and a reason06RecycleDisposal routeand evidenceFLOW INTO THE RECORDLIFECYCLE PROGRESSIONRECALL INTERVENTIONRETURN TO SERVICE AFTER RECTIFICATION
0 1
Register
Installer records the asset from the job, the location page, a QR scan or a bulk import.
0 2
Tag
An ID is issued and a printable QR sticker goes on the equipment.
0 3
Test
Intervals default from the type and its standard; next due is calculated from the last test.
0 4
Defect
Faults raised against the asset — or the individual circuit — and tracked to close-out.
0 5
Recall
A recall notice matches make, model and batch across every site and lists the affected assets.
0 6
Decommission
Taken out of service with a date, a reason and the job it came off — never deleted.
0 7
Recycle
Disposal route and evidence recorded against the retired asset for the site's waste record.
Core functions

Five things the register does every day.

0 1

Location register

Every asset at a site in one view, grouped by type. Counts, overdue tests, upcoming due dates and open defects sit at the top; selecting a type opens its full schedule with make, model, area, last test and next due.

Location 004 · Northgate Medical Centre128 assets
TypeCountDueNext testStandard
Switchboards4112 Sep 2026AS/NZS 3000
RCDs38502 Sep 2026AS/NZS 3760
Emergency lighting54018 Jan 2027AS/NZS 2293
Smoke alarms26004 Mar 2027AS 1851
EV chargers6027 Nov 2026AS/NZS 3000
0 2

Four ways to register an asset

From the location page by office staff, from a job by the technician on site, by scanning the QR sticker on the equipment, or in bulk by importing an existing spreadsheet register. All four land in the same four-step form.

From the location
Office staff, at the desk
From a job
Technician, on the phone
By QR scan
Unknown tag starts a registration
By bulk import
Your existing spreadsheet
S T E P 1
Type
S T E P 2
Details
S T E P 3
Testing & compliance
S T E P 4
Tag & confirm
0 3

QR tagging

Each asset is issued an ID and a printable QR sticker. On site, a technician scans the sticker to open the asset, log a test or raise a defect. An unrecognised tag starts a new registration with the location already filled in from the job.

Asset tag
IOPS-004-SB1
Main switchboard · Plant room
Scan opens
The asset, with last test and by whom
Log a test against this asset
Raise a defect
Unknown tag → new registration
0 4

Compliance tracking

Test intervals default from the asset type and the standard that applies to it. Next due dates are calculated from the last recorded test, overdue items surface at both site and asset level, and a reminder can be raised ahead of the due date. Certificates attach to the asset and the location together.

AssetIntervalLast testStatus
RCD · Ward 2 sub-board6 months02 Mar 2026Overdue 14 d
Exit light · Corridor B6 months18 Jul 2026Due in 22 d
Switchboard MSB-112 months12 Sep 2025Due in 34 d
EV charger · Bay 312 months27 Nov 2025Compliant
0 5

Asset history

Every asset carries a timeline: tests passed and failed, defects raised, relocations, layout changes, firmware updates and the original registration. Filterable by tests, events and changes, and attributable to a technician and a job number.

AllTestsEventsChanges
02 Aug 2026Test failed — RCD trip time 42 ms, above limitJ. Nguyen · #4821
02 Aug 2026Defect raised — replace RCD, circuit C-14J. Nguyen · #4821
14 Feb 2026Layout change — two ways added, schedule reprintedA. Buckham · #4402
12 Sep 2025Test passed — annual board inspectionA. Buckham · #3980
08 Jun 2016Registered — original installation, 36 way boardM. Ellis · #0114
Specialist view 01

A switchboard is recorded as a board, not a line item.

The board is drawn as it is built: DIN rails of modules, each device sized by its pole count and coloured by type, with main switch, MCBs, RCBOs, RCDs and spare ways all visible at a glance. Devices that failed or are approaching a test date are flagged in place.

MSB-1 · Plant room · 36 way4 spare ways
Rail 1
MAIN
100 A
RCD
63 A
RCBO
32 A
Rail 2
RCD
40 A
C14RCBO
20 A
Rail 3
SOLAR
3P 40 A
EV
32 A
Main switchRCD / RCBOMCBFailed last testSpare way
Selected · C-14
Ward 2 GPOs
RCBO · 1 pole · position 2-04
Rating
20 A · C curve
Protection
30 mA RCD
Last test
02 Aug 2026
Result
Failed · 42 ms
Log a testRaise a defect

The board schedule stays synchronised with the layout, so adding a circuit updates the printed schedule and the label sheet at the same time. Spare capacity is a fact on the page rather than something a technician counts on the day.

Specialist view 02

Connected equipment reports itself.

Where a battery system exposes telemetry, the asset page reads it live — and its alarms land in the same history timeline as the manual test records. Faults surface before the customer calls.

Battery · Northgate plant roomTelemetry live
State of charge
78%
Solar generation
6.4 kW
Site load
4.1 kW
Grid export
2.3 kW
State of health
96%
Cycles
1,284
24-hour state of charge
00:0006:0012:0018:0024:00
Device alarms → history
Cell imbalance — module 3, 04:12
Grid outage — 12 min, backup engaged
Firmware updated — inverter v4.2.1
Who it's for

Four people, one record.

Contractors with maintenance sites

Medical centres, schools, aged care, strata and commercial buildings — anywhere the same address is attended repeatedly and the equipment outlasts the contract.

Technicians on site

Scan a tag, see what was done last time and by whom, log the test on the phone before leaving the building.

Office & compliance staff

See what is overdue across a site, schedule the job from the same screen, and export the register or board schedule when a client asks for evidence.

Building owners & agents

A defensible record of what is installed, when it was last tested and when it is next due, held against the property itself.

Bring your register with you.

Send us the spreadsheet you keep today and we'll show you what it looks like as a live register — tagged, scheduled and attached to the addresses it belongs to.

Talking points
The register belongs to the address, not the account. Contracts change; the history does not.Registration happens where the equipment is, in the time it takes to scan a sticker.Test intervals and standards come from the asset type, so due dates are calculated rather than remembered.A switchboard is recorded as a board — every circuit, every spare way.